Reactor top and catwalk at the plant, with a US flag on the rail

Manufacturing

Lab-tested coating, made in the Florida plant. Installed by Houston crews.

FREE In-Home Estimate

The plant

Made in the Florida plant

This country was built by people who made things, and that is the America we still believe in. In Florida, someone built a plant because what was out there failed.

The coating that comes out of it travels to a Houston garage, where a crew that learned the trade from the crew before it puts it down.

Two stainless steel reactors with mixers on the plant floor

The lab

The science: every batch lab tested

Every batch goes through the lab: a QUV sun test, a stress test and a separation test. Every batch. Every single one.

A tech in Florida watches the panel and writes down the result, batch after batch, for every floor in Houston.

The accelerated weathering tester in the lab, with sample shelves behind it
  • Coating test strips clamped on a drawdown rack in the lab
  • A lab bench with a dispersion mixer, a scale and a control panel
  • A tensile tester on the lab bench
  • QUV sun test

    The sun test. 1,000 hours of QUV exposure equals roughly five years of Florida sun.

  • Stress test

    A tech pulls the sample, runs the test and logs the result.

  • Separation test

    Run on every batch, with the result on file.

The crews

Installed by Houston crews

Houston crews, trained to put this floor down.

One Floor. Two Guarantees. Guaranteed not to peel for the life of your home. Guaranteed not to fade for fifteen years. Both in writing.

A finished flake floor in window light

Ask your installer where their coating was made. Then ask to see the plant.

How it works

  1. Book a free in-home estimate

    About an hour, exact price the same day.

  2. Back on your floor in twenty four hours.

Questions and answers

Where is the coating made?

The coating on your garage floor is made in a plant, not bought off a shelf. Lab-tested coating, made in the Florida plant. Installed by Houston crews.

How is each batch tested?

Every batch goes through the lab: a QUV sun test, a stress test and a separation test. 1,000 hours of QUV exposure equals roughly five years of Florida sun.

Who installs the floor?

Houston crews, trained to put this floor down.

What warranty comes with it?

One Floor. Two Guarantees. Guaranteed not to peel for the life of your home. Guaranteed not to fade for fifteen years. Both in writing.